A switched network has converged completely. All switches currently have a VTP revision number of 5. A new switch that has been configured as a VTP server is added to the network. The new switch has a VTP revision number of 4. What will occur within the network?
IT Exam Items Repository › Category: CCNA › A switched network has converged completely. All switches currently have a VTP revision number of 5. A new switch that has been configured as a VTP server is added to the network. The new switch has a VTP revision number of 4. What will occur within the network?
A switched network has converged completely. All switches currently have a VTP revision number of 5. A new switch that has been configured as a VTP server is added to the network. The new switch has a VTP revision number of 4. What will occur within the network?
- The network will no longer share VLAN database updates.
- The newly added switch will automatically switch to VTP client mode.
- The VTP databases will remain unchanged in all switches with the exception of the newly added switch.
- All switches in the network will update their VTP database to reflect the VTP database of the new switch.
Related exam: CCNA 3 ScaN (v5.0.3 + v6.0) Final Exam Answers
About The Author
The ITExamAnswers Editorial Team is a dedicated group of certified IT professionals and network engineers. We rigorously review, verify, and update all exam materials to ensure you receive the most accurate and reliable resources for your certification journey.