An engineer is asked to protect unused ports that are configured in the default VLAN on a switch. Which two steps will fulfill the request? (Choose two)

IT Exam Items Repository › An engineer is asked to protect unused ports that are configured in the default VLAN on a switch. Which two steps will fulfill the request? (Choose two)

An engineer is asked to protect unused ports that are configured in the default VLAN on a switch. Which two steps will fulfill the request? (Choose two)

  • A. Configure the ports in an EtherChannel.
  • B. Administratively shut down the ports.
  • C. Configure the port type as access and place in VLAN 99.
  • D. Configure the ports as trunk ports.
  • E. Enable the Cisco Discovery Protocol.

Related exam: CA201