An engineer is implementing a coordinated change with a server team. As part of the change, the engineer must configure interlace GigabitEthernet2 in an existing VRF "RED" then move the interface to an existing VRF "BLUE" when the server team is ready. The engineer configured interface GigabitEthemet2 in VRF "RED". Which configuration completes the change?
ITExam Editorial Team
Last Updated: Feb 17, 2022
IT Exam Items Repository › Category: CCNP 300-410 › An engineer is implementing a coordinated change with a server team. As part of the change, the engineer must configure interlace GigabitEthernet2 in an existing VRF "RED" then move the interface to an existing VRF "BLUE" when the server team is ready. The engineer configured interface GigabitEthemet2 in VRF "RED". Which configuration completes the change?
An engineer is implementing a coordinated change with a server team. As part of the change, the engineer must configure interlace GigabitEthernet2 in an existing VRF "RED" then move the interface to an existing VRF "BLUE" when the server team is ready. The engineer configured interface GigabitEthemet2 in VRF "RED". Which configuration completes the change?

A. interface GigabitEthernet2
no ip address
vrf forwarding BLUE
B. interface GigabitEthernet2
no vrf forwarding RED
vrf forwarding BLUE
ip address 10.0.0.0 255.255.255.254
C. interface GigabitEthernet2
no vrf forwarding RED
vrf forwarding BLUE
D. interface GigabitEthernet2
no ip address
ip address 10.0.0.0 255.255.255.254
vrf forwarding BLUE
Correct Answer: B
Related exam: CCNP ENARSI 300-410 Dumps