On a network of one department, there are four PCs connected to a switch, as shown in the following figure: After the Switch1 restarts. Host A (the host on the left) sends the first frame to Host C (the host on the right). What the first thing should the switch do?
IT Exam Items Repository › On a network of one department, there are four PCs connected to a switch, as shown in the following figure: After the Switch1 restarts. Host A (the host on the left) sends the first frame to Host C (the host on the right). What the first thing should the switch do?
On a network of one department, there are four PCs connected to a switch, as shown in the following figure: After the Switch1 restarts. Host A (the host on the left) sends the first frame to Host C (the host on the right). What the first thing should the switch do?
- Switch1 will add 192.168.23.12 to the switching table.
- Switch1 will add 192.168.23.4 to the switching table.
- Switch1 will add 000A.8A47.E612 to the switching table.
- None of the above
Related exam: CCNA v3.0 (200-125) Study Guide – Exam Dumps
About The Author
The ITExamAnswers Editorial Team is a dedicated group of certified IT professionals and network engineers. We rigorously review, verify, and update all exam materials to ensure you receive the most accurate and reliable resources for your certification journey.