Refer to the exhibit. A student is responsible for the IP addressing, configuration and connectivity testing of the network shown in the graphic. A ping from host B to host C results in a destination unreachable but a ping from host B to host A was successful. What two reasons could account for this failure based on the graphic and partial router output for the Dallas router? (Choose two.)
IT Exam Items Repository › Category: Network Fundamentals › Refer to the exhibit. A student is responsible for the IP addressing, configuration and connectivity testing of the network shown in the graphic. A ping from host B to host C results in a destination unreachable but a ping from host B to host A was successful. What two reasons could account for this failure based on the graphic and partial router output for the Dallas router? (Choose two.)
Refer to the exhibit. A student is responsible for the IP addressing, configuration and connectivity testing of the network shown in the graphic. A ping from host B to host C results in a destination unreachable but a ping from host B to host A was successful. What two reasons could account for this failure based on the graphic and partial router output for the Dallas router? (Choose two.)

- The host A is turned off.
- The Fa0/0 interface on Dallas is shutdown.
- The LAN cable is disconnected from host B.
- The S0/0/1 IP address of Dallas is improperly configured.
- The Fa0/0 interface on Dallas is in a different subnet than host B.
- The clock rate is missing on the serial link between Dallas and NYC.
Related exam: Network Fundamentals - CCNA Exploration 1: ENetwork Chapter 11 Exam
About The Author
The ITExamAnswers Editorial Team is a dedicated group of certified IT professionals and network engineers. We rigorously review, verify, and update all exam materials to ensure you receive the most accurate and reliable resources for your certification journey.