Refer to the exhibit. The administrator tried to create an EtherChannel between S1 and the other two switches via the commands that are shown, but was unsuccessful. What is the problem?

IT Exam Items RepositoryCategory: CCNARefer to the exhibit. The administrator tried to create an EtherChannel between S1 and the other two switches via the commands that are shown, but was unsuccessful. What is the problem?

Refer to the exhibit. The administrator tried to create an EtherChannel between S1 and the other two switches via the commands that are shown, but was unsuccessful. What is the problem?

  • Traffic cannot be sent to two different switches through the same EtherChannel link.
  • Traffic cannot be sent to two different switches, but only to two different devices like an EtherChannel-enabled server and a switch.​
  • Traffic can only be sent to two different switches if EtherChannel is implemented on Gigabit Ethernet interfaces.​
  • Traffic can only be sent to two different switches if EtherChannel is implemented on Layer 3 switches.​

Explanation: An EtherChannel link can only be created between two switches or between an EtherChannel-enabled server and a switch. Traffic cannot be sent to two different switches through the same EtherChannel link.

Related exam: CCNA 2 v7 Checkpoint Exam: Redundant Networks Exam Answers
Related exam: CCNP Core Networking: Modules 1 - 5 Checkpoint Exam: L2 Redundancy Exam