What must be specified by the X509v3 validity date range? (choose two)

IT Exam Items RepositoryCategory: Network DefenseWhat must be specified by the X509v3 validity date range? (choose two)

What must be specified by the X509v3 validity date range? (choose two)

  • after
  • before
  • not after
  • not before

Explanation: The X.509v3 certificates specify “not before” and “not after” dates. If the current date is outside the range, the web browser displays a message.

Related exam: 8.7.4 Check Your Understanding – Recommend Encryption