Which process is associated with spanning-tree convergence?

IT Exam Items Repository › Which process is associated with spanning-tree convergence?

Which process is associated with spanning-tree convergence?

  • determining the path cost
  • electing designated ports
  • learning the sender bridge ID
  • assigning the port ID

Explanation: SPT must performs three steps to provide a loop-free network topology:

1. Elects one root bridge
2. Select one root port per nonroot bridge
3. Select one designated port on each network segment -> Answer B is correct.

Related exam: CCNA v3.0 (200-125) Study Guide – Exam Dumps