Refer to the exhibit. Based on the output from the show running-config and debug ip rip commands, what are two of the routes that are added to the routing table of R1? (Choose two.)
IT Exam Items Repository › Category: CCNA 2 v4 › Refer to the exhibit. Based on the output from the show running-config and debug ip rip commands, what are two of the routes that are added to the routing table of R1? (Choose two.)
Refer to the exhibit. Based on the output from the show running-config and debug ip rip commands, what are two of the routes that are added to the routing table of R1? (Choose two.)

- R 192.168.1.0/24 [120/1] via 172.16.2.1, 00:00:24, Serial0/0/1
- R 192.168.100.0/24 [120/1] via 172.16.1.1, 00:00:24, Serial0/0/0
- S 192.168.1.0/24 [1/0] via FastEthernet0/0
- R 192.168.9.0/24 [120/1] via 172.16.2.1, 00:00:24, Serial0/0/0
- R 192.168.2.0/24 [120/1] via 172.16.1.2, 00:00:24, Serial0/0/0
Related exam: CCNA Exploration 2: ERouting Practice Final Exam
Related exam: CCNA Exploration 2: ERouting Final Exam
About The Author
The ITExamAnswers Editorial Team is a dedicated group of certified IT professionals and network engineers. We rigorously review, verify, and update all exam materials to ensure you receive the most accurate and reliable resources for your certification journey.