Which statement correctly describes the spanning-tree path cost?

IT Exam Items RepositoryCategory: CCNA 3 v4Which statement correctly describes the spanning-tree path cost?

Which statement correctly describes the spanning-tree path cost?

  • It is calculated based on the total number of switches connected in a loop.
  • It is calculated based on the utilization of all the switches along a given path.
  • It is calculated based on the bridge priority of the switches along a given path.
  • It is calculated based on the sum of the port cost value, determined by link speed, for each switch port along a given path.