Which three steps are required to configure interfaces as routed ports on a multilayer Catalyst switch? (Choose three.)

IT Exam Items RepositoryCategory: CCNPWhich three steps are required to configure interfaces as routed ports on a multilayer Catalyst switch? (Choose three.)

Which three steps are required to configure interfaces as routed ports on a multilayer Catalyst switch? (Choose three.)

  • Enable IP routing globally.
  • Assign IP addresses to routed ports.
  • Configure SVI for each VLAN in the network.
  • Configure 802.1 Q encapsulation on routed ports.
  • Disable Power over Ethernet (PoE) on the physical Layer 3 interfaces.
  • Disable Layer 2 functionality on interfaces that will be configured as routed ports.

Related exam: CCNP SWITCH Final Exam Answers
Related exam: CCNP SWITCH Final Exam Answers (Version 6)