When using RPR, what two events can trigger a switchover from the active to the standby Supervisor Engine? (Choose two.)

IT Exam Items RepositoryCategory: CCNPWhen using RPR, what two events can trigger a switchover from the active to the standby Supervisor Engine? (Choose two.)

When using RPR, what two events can trigger a switchover from the active to the standby Supervisor Engine? (Choose two.)

  • port failure
  • an RP or SP crash on the active Supervisor Engine
  • loss of packets from the root bridge
  • clock synchronization failure between the Supervisor Engines
  • frames received on a port that is in blocking mode

Related exam: CCNP SWITCH Chapter 9 Exam Answers
Related exam: CCNP SWITCH (Version 6.0) Chapter 5 Exam