What are two practices a network technician should follow when installing a new interface card in a router? (Choose two.)

IT Questions BankCategory: CCNA Discovery v4What are two practices a network technician should follow when installing a new interface card in a router? (Choose two.)

What are two practices a network technician should follow when installing a new interface card in a router? (Choose two.)

  • Be sure the interface card faceplate does not touch the chassis rear panel.
  • Do not tighten the captive screws until the router has been powered on and recognizes the card.
  • Store the blank faceplate inside the card slot to be used if the card is removed.
  • Handle the interface card by the edges to avoid static discharge.
  • Push the interface card into place until the edge connector is seated securely

Exam with this question: CCNA Discovery 4: DCompNtwk Chapter 3 Exam

Subscribe
Notify of
guest

0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x