Question:
Which process is associated with spanning-tree convergence?
- determining the path cost
- electing designated ports
- learning the sender bridge ID
- assigning the port ID
Explanation: SPT must performs three steps to provide a loop-free network topology:
1. Elects one root bridge
2. Select one root port per nonroot bridge
3. Select one designated port on each network segment -> Answer B is correct.
Exam with this question: CCNA v3.0 (200-125) Study Guide – Exam Dumps
Please login or Register to submit your answer