Why is it important to record baseline measurements of a prototype network?

IT Questions BankCategory: CCNA Discovery v4Why is it important to record baseline measurements of a prototype network?

Why is it important to record baseline measurements of a prototype network?

  • Test results show security weaknesses after the baseline tests are run.
  • The baseline is the point at which the network is operating at its fullest potential.
  • Baseline measurements define a point at which network traffic has exceeded the designed capabilities of the network.
  • Test results are compared to the baseline to see how the test conditions increase processor use or decrease available bandwidth.

Exam with this question: CCNA Discovery 4: DCompNtwk Chapter 7 Exam