Refer to the exhibit. A network administrator is configuring MST tuning on SW1. The objective is to change the path cost value of the interface Gi1/0/1 to represent a higher-speed bandwidth link. Which value could be used in the command spanning-tree mst 0 cost for this task?

IT Questions BankCategory: CCNPRefer to the exhibit. A network administrator is configuring MST tuning on SW1. The objective is to change the path cost value of the interface Gi1/0/1 to represent a higher-speed bandwidth link. Which value could be used in the command spanning-tree mst 0 cost for this task?

Refer to the exhibit. A network administrator is configuring MST tuning on SW1. The objective is to change the path cost value of the interface Gi1/0/1 to represent a higher-speed bandwidth link. Which value could be used in the command spanning-tree mst 0 cost for this task?

  • 0
  • 1
  • 24576
  • 32768

Explanation: As shown in the output, the interface STP cost is derived from the media speed of the interface using the long-mode method. Using this method, the range of the interface path cost is from 1 to 200000000. A lower path cost represents higher-speed transmission bandwidth.

Exam with this question: CCNPv8 ENCOR (Version 8.0) - L2 Redundancy Exam

Subscribe
Notify of
guest

0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x