Refer to the exhibit. Switch1 is configured for VTP as shown. An administrator connects four switches to Switch1 and configures trunk links between them. Which of the four switches will successfully receive and install VTP updates from Switch1?

IT Questions BankCategory: CCNA 3 v4Refer to the exhibit. Switch1 is configured for VTP as shown. An administrator connects four switches to Switch1 and configures trunk links between them. Which of the four switches will successfully receive and install VTP updates from Switch1?

Refer to the exhibit. Switch1 is configured for VTP as shown. An administrator connects four switches to Switch1 and configures trunk links between them. Which of the four switches will successfully receive and install VTP updates from Switch1?

  • Option 4

Exam with this question: CCNA Exploration 3: ESwitching Practice Final Exam ./.

Subscribe
Notify of
guest

0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x