The trunk link between two 2960 switches has reached its capacity. How can this be addressed in the most economical way?

IT Questions BankThe trunk link between two 2960 switches has reached its capacity. How can this be addressed in the most economical way?

The trunk link between two 2960 switches has reached its capacity. How can this be addressed in the most economical way?

  • Increase the speed of the ports.
  • Decrease the size of the inter-switch collision domain by configuring additional VLANs.
  • Combine physical ports into a high-speed logical link by configuring EtherChannel.
  • Create additional broadcast domains by inserting a router between the switches.

Exam with this question: CCNA 3 (v5.0.3 + v6.0) Chapter 3 Exam Answers

Subscribe
Notify of
guest

0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x