Which two components are normally considered part of change control? (Choose two.)

IT Questions BankCategory: CCNPWhich two components are normally considered part of change control? (Choose two.)

Which two components are normally considered part of change control? (Choose two.)

  • the cost of network changes
  • the authorization that is required to make changes
  • the technology that is used to implement changes
  • the staff changes that are required to carry out repairs
  • the time when changes can be made

Exam with this question: CCNP TSHOOT Chapter 3 Exam Answers (Version 7)