A network technician needs to install a four-port switch module in an operational Cisco 1841 router that has an available HWIC slot. What should the technician do first?
- Turn off the power to the router before installing the new module.
- Install the hot-swappable four-port switch module directly into slot 1 of the 1841.
- Move the existing WIC-2T module to slot 1 and install the four-port module in slot 0.
- Shut down all Fast Ethernet ports on the router until the switch module installation is complete.
Exam with this question: CCNA Discovery 4: DCompNtwk Final Exam
Please login or Register to submit your answer