Refer to the exhibit. The link between switch SW1 and SW2 is manually configured as full duplex on SW2 and with half duplex on SW1. How could this impact the STP operations?

IT Questions BankCategory: CCNPRefer to the exhibit. The link between switch SW1 and SW2 is manually configured as full duplex on SW2 and with half duplex on SW1. How could this impact the STP operations?

Refer to the exhibit. The link between switch SW1 and SW2 is manually configured as full duplex on SW2 and with half duplex on SW1. How could this impact the STP operations?

  • Switch SW2 can move port Fa0/3 into a forwarding state, thereby creating a Layer 2 loop.
  • Switch SW1 shuts down the Fa0/1 port and thus reinforces a new spanning-tree calculation.
  • Switch SW2 negotiates the Fa0/1 port on SW1 to be in full-duplex mode which keeps SW1 as the root bridge for the spanning tree.
  • Switch SW1 negotiates the Fa0/2 port on SW2 to be in half-duplex mode and thus forces SW2 to become the root bridge for the spanning tree.

Exam with this question: CCNP SWITCH Final Exam Answers
Exam with this question: CCNP SWITCH Final Exam Answers (Version 6)

Subscribe
Notify of
guest

0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x