Open the PT Activity. Perform the tasks in the activity instructions and then answer the question. Fill in the blank. Do not use abbreviations.Which command is missing on the Layer 3 switch to restore the full connectivity between PC1 and the web server? (Note that typing no shutdown will not fix this problem.)

IT Questions BankOpen the PT Activity. Perform the tasks in the activity instructions and then answer the question. Fill in the blank. Do not use abbreviations.Which command is missing on the Layer 3 switch to restore the full connectivity between PC1 and the web server? (Note that typing no shutdown will not fix this problem.)

Question:
Open the PT Activity. Perform the tasks in the activity instructions and then answer the question. Fill in the blank. Do not use abbreviations.Which command is missing on the Layer 3 switch to restore the full connectivity between PC1 and the web server? (Note that typing no shutdown will not fix this problem.)

Correct Answer: ip address 192.168.20.1 255.255.255.0

Explanation: On the Layer 3 switch, an SVI has to be explicitly created for each VLAN. PC1 belongs to VLAN 10, which is already created on the Layer 3 switch and with an IP address assigned. The web server belongs to VLAN 20. The interface vlan 20 command was already entered on the Layer 3 switch, but with no IP address assigned to it. So the ip address 192.168.20.1 255.255.255.0 command has to be entered in the interface vlan 20 interface mode.​ To test the connectivity between the PC1 and the web server, access PC1, select the Desktop tab, click on the Web Browser application and enter on the URL box "www.webserver.com". A message "Congratulations! You've got it!​" will be displayed.​

Exam with this question: CCNA 3 (v5.0.3 + v6.0) Chapter 2 Exam Answers
Exam with this question: CCNA 2 (v5.0.3 + v6.0) Chapter 5 Exam Answers

Subscribe
Notify of
guest

0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x