Category: CCNP SWITCH LAB
Topology Objectives Implement Multiple Spanning Tree Leverage VTP version 3 with MST Background Cisco’s Per VLAN Spanning Tree (PVST) provides a significant step up from standard spanning tree in terms of flexibility, allowing each VLAN to have its own independent spanning tree, thereby make better use of available …
Topology Objectives Observe default Spanning Tree behavior Implement Rapid Spanning Tree Implement STP tool kit components Background The potential effect of a loop in the layer 2 network is significant. Layer 2 loops could impact connected hosts as well as the network equipment. Layer 2 loops can be …
Topology Objectives Create EtherChannel Links. Configure and test load balancing options Background Four switches have just been installed. The distribution layer switches are Catalyst 3560 switches, and the access layer switches are Catalyst 2960 switches. There are redundant uplinks between the access layer and distribution layer. Usually, only …
Topology Objectives Setup a VTP v2 Domain. Create and maintain VLANs. Configure 802.1Q Trunking. Setup a VTP v3 Domain. Background VLANs logically segment a network by function, team, or application, regardless of the physical location of the users. End stations in a particular IP subnet are often associated …
Topology Objectives Clear the configuration of all the switches in your pod Configure the database template used by all the switches in your pod Save a baseline configuration for all the switches in your pod Background When working with a switch that has been previously configured, any new …