Category: CCNP SWITCH LAB

CCNP SWITCH Chapter 3 Lab 3-2 – EtherChannel (Version 7)

Topology Objectives Create EtherChannel Links. Configure and test load balancing options Background Four switches have just been installed. The distribution layer switches are Catalyst 3560 switches, and the access layer switches are Catalyst 2960 switches. There are redundant uplinks between the access layer and distribution layer. Usually, only …